INSTALLATION REQUIREMENTS:
Be certain that three phase current is available at
the point of installation (see TECHNICAL DATA
for information concerning required pre-fusing of
the electrical outlet).
Note: Since this machine can weigh up to 475 kg,
it is essential to check the permissible load per
square meter of the floor.
The machine may only be used for its
intended purpose!
The machine's mains connection must
be freely accessible!
The machine should only be operated
in closed rooms within a temperature
range of 10 to 40° C!
12
7
13
fig. 1
7
14
fig. 2

INSTALLATION

SUMMARY OF NUMBERED PARTS:
6
= Housing (fig. 1, 2, 4)
7
= Table (fig. 1, 2, 4, 5, 6)
8
= Guard panel (fig. 4)
9
= Bag frame (fig. 9)
10 = Discharge door (fig. 9)
11 = Rubber band(fig. 9)
12 = Conveyer belt (fig. 1, 4)
13 = Conveyor belt retainer (fig. 1)
14 = Cable holders (fig. 2, 6)
15 = Angle guard (fig. 5) (optional)
SETTING UP THE SHREDDER:
1. Remove the external wooden covers.
2. Remove the protective sheet material.
3. Lift the machine little by little from the pallet with
the help of a pallet jack, and then set it onto the
floor on the rollers.
Note: The pallet must be unscrewed and dis-
mantled piece by piece to this end, and the
machine must be grasped, lifted and set back
down again with the pallet jack after each
dismantling operation.
12
6
6
7
8
fig. 3
6
fig. 4
6
MOUNTING THE TABLE (7) (fig. 1, 2, 3):
1. Remove the 3 screws from the housing front
panel (6), as well as the 3 screws from the front
of the conveyor belt retainer (13).
2. Set the table (7) onto the conveyor belt retainer
(13), push it all the way back to the housing (6)
and secure it to the housing front panel and the
front of the conveyor belt retainer with the
previously removed screws (fig. 1, 2 and 3).
MOUNTING THE GUARD PANELS (fig. 4):
1. Remove the 2 screws from the left and right-
hand housing side panels.
2. Secure the two guard panels (8) to the left and
right-hand housing side panels with the 4 pre-
viously removed screws, and to the table (7)
with the 4 separately included screws, nuts and
spring-type lock washers.
Note: If required, the width of the table can be
enlarged through the use of two angle guards (15)
(fig. 5) instead of the two guard plates (8) (fig. 4)
(see also "ACCESSORIES").
COILING UP THE POWER CABLE (fig. 6):
If the entire length of the power cable is not
required at the respective location, or when mov-
ing the machine from one location to another, the
power cable can be coiled up around the cable
holders.
7