Herunterladen Inhalt Inhalt Diese Seite drucken

Pfannenberg DTT 6801 Serie Betriebsanleitung Seite 104

Dachaufbau-kühlgeräte
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
ENG
4.5.5.3
Unit preparation – fitting the bracket
Fig. 18: Mounting the bracket
Operating Manual | Roof-mounted Cooling Unit | Standard Controller (SC) – 400 / 460 V, 3~ | 086100040b
Procedure
1.
Puncture the insulation of the bracket opening (1) with a
screwdriver. Turn 2× to the right and 2× to the left.
2.
Mount the two brackets (3) with the four screws (2) and the four
washers (accessory kit).
The openings of the brackets face forwards.
3.
Remount the cover and the front flap in reverse order.
4.
Tighten the screws and plug in the earthing cables.
Preparation of the unit is completed. The cooling unit is ready for
assembly with the quick-change frame.
G00041
36/37

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis