Herunterladen Inhalt Inhalt Diese Seite drucken

Storage; Transport; Requirements To Be Met Before Installation - Honeywell TRZ2 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 38
Honeywell

3.2 Storage

 Store the device in a dry and dust-free location.
 Avoid constant direct sunlight.
 Store the device in its original packaging.
 Storage temperature: -25 to +70°C / -13 to +158°F.

3.3 Transport

INFORMATION!
Do not lift the measuring instrument by the index.

3.4 Requirements to be met before installation

 Remove sealing caps and foils.
 Check the meter and accessories for signs of transport damage.
 Check that the turbine moves easily by generating a gentle air current.
 Ensure that you have all the tools you require available.
 Check that all the accessories are present (e.g. plug connectors, oil for
initial filling).
 Seals which are suitable for your operating medium (see Table 4 for
examples). Please also check whether you must comply with other
standards, e.g. DIN EN 1591, Parts 1 – 4.
Table 4 | Suitable seals and gaskets
20
DN
d1 [mm]
50
62
80
100
100
125
150
178
73018696f
© Elster GmbH | All rights reserved. Subject to modification
The following seals and
gaskets, among others, are
suitable:
- flat seals
- spiral-wound gaskets
- grooved seals and gaskets

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Q / q75

Inhaltsverzeichnis