BRS-LC
P1
P2
P3
P4
Y1
Y2
Y4
Air-blast option
Ready
Tab. 17
Explanations
BAL.0123 • 2020-12-15
Position above cleaning station
Cleaning position (torch in clamping position)
Option: Position above injection unit
Option: Injection position (valve Y4 is mechanically operated by torch that has been moved inward)
Solenoid valve stroke UP/DOWN
Solenoid valve clamping cylinder CLAMP/RELEASE and pneumatic motor ON/OFF
Option: mechanical/tactile-operated injection valve
Air blast through cable assembly (ON/OFF)
Home position of the torch cleaning station (stroke cylinder down, S1 activated)
13 Appendix
EN - 27