BRS-LC
8 Decommissioning
NOTICE
• When decommissioning the system, ensure that the procedures for switching off the welding components are
observed.
1 Close off the compressed air supply.
9 Maintenance and cleaning
Scheduled maintenance and cleaning are prerequisites for a long service life and trouble-free operation.
DANGER
Risk of injury due to unexpected start
Improper operation can lead to serious injuries that could result in death.
The following instructions must be adhered to during all maintenance, servicing, assembly, disassembly and repair work:
• Switch off the power source.
• Close off the compressed air supply.
• Disconnect all electrical connections.
• Switch off the entire welding system.
DANGER
Electric shock due to defective cables
Dangerous voltages may be present if cables are defective or have been improperly installed. This can lead to serious
injuries that could result in death.
• Check all live cables and connections for proper installation and damage.
• Replace any damaged, deformed or worn parts.
NOTICE
• Only qualified personnel are permitted to perform work on the device or system.
• Always wear your personal protective equipment when performing maintenance and cleaning work.
• Consult the documentation for the welding components.
9.1 Maintenance intervals
NOTICE
• The specified maintenance intervals are standard values and refer to single-shift operation.
When using arc welding equipment, always observe the provisions of EN 60974-4 Inspection and testing, as well as any
national laws and regulations.
Check the following:
Weekly
• Check the condition of the reamer.
• Clean the clamping unit or the reamer.
Tab. 14
Maintenance intervals
BAL.0123 • 2020-12-15
8 Decommissioning
Monthly
• Monthly basic cleaning is recommended, and
necessary in case of extreme working conditions.
• Check the upstream maintenance unit's oil level and
ability to function correctly.
EN - 21