Herunterladen Inhalt Inhalt Diese Seite drucken

Unpacking; Preparing For Installation; Installing The Appliance - Inventum IOP6272BK Benutzerhandbuch

Einbau-ofen pyrolyse
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

UNPACKING

1. Remove the packaging.
Caution:
Make sure that you remove the sticker from the door.
2. Examine the appliance for damage.
3. Make sure that the voltage is the same as on the type plate.

PREPARING FOR INSTALLATION

(Figure 3)
(*) The minimum dimension for B1 is 585 mm and the maximum dimension is 595 mm.
Note:
Make sure that the kitchen furniture is prepared according to the dimensions of the appliance.

INSTALLING THE APPLIANCE

Preliminary requirements
1.
Make sure that the kitchen furniture is prepared according to the correct dimensions.
Warning:
Two persons are required to install the appliance.
Caution:
Make sure that the mains cable does not get jammed during installation or is placed on top of the
appliance.
Caution:
Do not cover the opening between the kitchen furniture and the top of the appliance. The opening is
required for ventilation.
Note:
It is possible to connect the appliance to the mains supply before positioning the appliance.
Procedure
1. Put the appliance (A) in the center of the kitchen furniture.
Caution:
Make sure that there is a minimum space of 2 mm between the appliance and the walls of the kitchen
furniture.
2. Open the door (E) of the appliance.
3. Place the appliance in the kitchen furniture.
4. Install the plugs (B).
5. Fasten the appliance to the kitchen furniture. Use the screws (D).
6. Install the covers (C).
7. Close the door.
8. Connect the appliance. Refer to section
34
English
'Connecting the appliance'
.
(Figure 4)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis