5. Leakage test

Before erecting the masonry, in addition to the
electrical test a leakage test must be conduct-
ed. For this purpose fill the whirl tub with water
up to the overflow. Leave the water to stand for
one hour and then switch on the whirl tub for
around 15 minutes. Any leaks caused by trans-
port of insallation can then be located.
Before installation of casing
the whirl tub you must conduct
a test. Before the tub is emptied
complete a full disinfection
procedure.

6. Jets

Back jet
Subject to technical alterations! Warranty is only granted, if all mentioned instructions were followed.

7. Final Blowing

The system drying function is switched on auto-
matically approx. 10 minutes after emptying the
bathtub. After switching on it works in total for
about 2 minutes, during which the blower works
for the fi rst 30 seconds with medium power, and
for the next 90 seconds with full power. While
emptying the bathtub you can manually switch
on the back jets drying function by pressing but-
ton 4 (duration approx. 2 minutes). The drying
function can be switched-off at any time.

8. LED colour light - optional

If one LED colour light have been installed as an
option, they can be switched on and off using
the 9 function.