3. Hydraulic oil
a. Fill in the hydraulic oil until the marking on the dipstick
b. For venting of the hydraulic circuit leave the tank cap open for the first 10 lifting movements.
4. Electrical connection
Hereby must be observed the general and local regulation. Therefore, this step can only be done
trained/skilled persons/experts.
only by
Pay attention to the necessary supply (see technical data).
5. Install the ramps with locking's on the scissor lift.
6. Control before the first lifting
a. all screws, nuts and so on for tightness
b. all connections and cylinders for leaks and retighten them if necessary
c. the oil level
d. all electrical connections (see electric diagram) as well as the ground cable
e. that the hydraulic system will be vented completely by lowering the lift completely and
pushing for appr. 15 seconds the button lowering further.
f. the function of the limit switch (OPT)
g. that the sliding guides of the base frame and the platform are lubricated (see lubrication
plan)
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-03
Manufacturer ATH-Heinl GmbH & CO.KG
- 14 -