Herunterladen Inhalt Inhalt Diese Seite drucken

Chapter V Maintenance Instructions; Daily Maintenance - SATA AE5101 Gebrauchsanweisung

4 t, manuell und erweitert portalhebemaschine
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 39
中文
AE5101/AE5101-3
EN
DE
RU
KO
PT
JA
ES
Chapter V
Maintenance Instructions

5.1 Daily maintenance

- Inspect all hydraulic joints, oil pipes, and cylinders for leakage.
- Inspect all electric wires for damage.
- Inspect all moving parts for excessive wear.
- Remove the oil stains on the rubber tray and inspect the rubber tray for excessive wear.
5.2 Maintenance after every 2 months
- Replace the grease in the post slideway.
- Replace the grease on the bracket arm pin.
- Inspect and tighten the nut of expansion bolt.
5.3 Maintenance after every 6 months
- Replace the grease on the chain and wire rope.
- Adjust the balance wire rope and safety rope.
- Inspect the wire rope for burrs.
5.4 Maintenance after every 2 years
- Replace the hydraulic oil.
32

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ae5101-3

Inhaltsverzeichnis