Herunterladen Inhalt Inhalt Diese Seite drucken

Franklin Electric 262 Serie Montage- Und Betriebsanleitung Seite 9

Wiederwickelbare unterwassermotoren
Vorschau ausblenden Andere Handbücher für 262 Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 15
Venting the motor
Checking the motor 6-12"
Topping up the motor 6-12"
Adjusting the motor
Figure 5-2: 6", 8", 10"motor
Place the motor horizontally so that the filling valve (2) is located at the highest position.
Remove the plug (21) from the filling valve (2).
Carefully push the test pin (1) into the filling valve (2) until air and some fluid escape from it.
6" / 8" / 10"
12"
Figure 5-5: Checking the motor fluid
6" / 8" / 10"
Figure 5-6: Topping up the motor fluid
Adjust the diaphragm position by draining (see Venting) or topping up motor fluid until the target
value is reached. (6" / 8" / 10")
Fit the valve plug (21) again.
Feed the test pin (1) through the opening in the diaphragm
housing (3) (8"/10" de-central cover opening) until resistance is
felt.
Measure the actual diaphragm distance to the side of the
opening in the diaphragm cover.
If the measured result is not identical to the target value:
44 mm 2 mm (6"/8" motor)
64 mm 2 mm (10" motor) or
Top up or drain motor fluid.
12" – Place the motor vertically and remove the PT100 plug
the fluid level must be on the threaded hole end
Apply the filling syringe (4) to the filling valve
(2).
Top up the motor filling fluid until the value of
the diaphragm position is lower than the target
value.
12" , overfill the motor with fluid
fit the PT100 plug screw
12"
Rewindable Submersible Motors
5 Pre-Operation Checks
Figure 5-3: 12" motors
7

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

263 serie264 serie265 serie266 serie

Inhaltsverzeichnis