CONTENTS
1.
WARNINGS .................................................................................................................................................................................. 21
2.
MANAGEMENT ............................................................................................................................................................................ 21
2.1
Storage ................................................................................................................................................................................ 21
2.2
Transport .............................................................................................................................................................................. 21
2.3
Dimensions and weights ...................................................................................................................................................... 21
3.
EXAMPLE OF INSTALLATION .................................................................................................................................................. 23
4.
TANK INSTALLATION ................................................................................................................................................................ 23
4.1
4.2
4.3
4.4
4.5
4.6
Connecting the ventilation pipe ............................................................................................................................................ 25
4.7
Closing the cover ................................................................................................................................................................. 25
4.8
Provision for emergency drainage ....................................................................................................................................... 25
4.9
Non-return valve .................................................................................................................................................................. 25
4.10
Interception gate valve ......................................................................................................................................................... 25
5.
PUMP INSTALLATION ................................................................................................................................................................ 25
6.
6.1
6.2
Electrical connections .......................................................................................................................................................... 27
7.
8.
FIRST START-UP ........................................................................................................................................................................ 29
8.1
Operating flow rate ............................................................................................................................................................... 29
8.2
Operation ............................................................................................................................................................................. 29
9.
MAINTENANCE ........................................................................................................................................................................... 29
10. TROUBLESHOOTING ................................................................................................................................................................. 30
11. DISPOSAL ................................................................................................................................................................................... 30
TECHNICAL DRAWINGS - pag.150
1.
WARNINGS
1.1
Check that the system has suffered no damage during transport or storage. In particular, ensure that the external casing is
perfectly entire and in excellent condition; check the efficiency of all the tank components; replace any parts that are not
perfectly efficient.
1.2
Do not use inflammable or highly corrosive liquids or anything other than indicated by standard En 12050-1
1.3
If the installation is indoors, adequate drainage must be ensured in the event of leakage from the tank
1.4
For correct installation, follow the instructions in chapters 2-3-4 below. If you want to install the Fekabox - Fekafos lifting
tanks outside the home, attention must be paid because the maximum admissible load on the cover is 100 kg (see
also the symbols on the cover).
2.
MANAGEMENT
2.1
Storage
All the products must be stored indoors, in a dry, vibration-free and dust-free environment, possibly with constant air humidity.
2.2
Transport
Avoid subjecting the products to needless jolts or collisions.
To lift and transport the tank, use lifting equipment and the pallet supplied standard (if applicable).
2.3
Dimensions and weights
The adhesive label on the package indicates the total weight of the system.
The dimensions below are given in millimetres.
Key to Symbols
Connection of delivery pipe or emergency outlet
Collection pipe inlet
Outlet of power cables and float cables
ENGLISH
Connection of ventilation pipe
Recyclable material
21