Herunterladen Inhalt Inhalt Diese Seite drucken

LUCCI Air AIRFUSION ARIA Installationsanleitung Seite 11

Vorschau ausblenden Andere Handbücher für AIRFUSION ARIA:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 17
Aria CTC Installation Instructions
BLADE ATTACHMENT (Fig.8)
1. Before installing the blades, remove the blade screws and flat washers from the bottom of fan
motor.
2. Align the 2 holes on the blade with the 2 holes on the rotating member of fan motor assembly and
using the 2 blade screws in step 1, to secure the blade to the fan motor assembly.
Ensure all screws are tightened evenly to reduce the chance of warping or unbalancing. Take care
not to over tighten the screws, as this can damage the blades.
3. Once completed, repeat the process on the remaining blades.
INSTALLING THE BOTTOM COVER (FOR FAN WITHOUT LIGHT Fig.9)
Secure the bottom motor cover to the fan by turning it clockwise.
FOR SKU# 212999 & 213000
INSTALLING THE LED LIGHT KIT (FOR FAN WITH LIGHT Fig.10)
Attach the LED light kit to the lamp base and connect wires to the LED light kit via the quick
-
connectors.
Secure the LED light kit on the lamp base by turning the LED light kit body clockwise. Take care not
-
to cross thread or twist and damage the wires.
FOR SKU# 213001 & 213002
10 | P a g e
INSTALLING THE FAN BLADE AND LIGHT KIT
Fig. 8
Fig. 9
Fig. 10
ARIA CTC V1.0
EU (2019/11)

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis