Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Connection; Installation And Connection In A Headend Base Unit - axing SKQ 40-00 Betriebsanleitung

Quattro-/octokassette
Vorschau ausblenden Andere Handbücher für SKQ 40-00:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

2. Installation and connection

The SKQ 40-00 can either be operated in a headend base unit SKS x0-xx or in stand alone mode. The SAT IF
signals of the LNB(s) are transmitted via a multiswitch or directly to the SAT IF inputs.
2.1.

Installation and connection in a headend base unit

If you wish to operate the SKQ 40-00 / 80-00 on a headend base unit SKS x-xx, plug the module into the output
collection field and fasten it with screws. Any free slot may be used.
The module is supplied with power by DC patch cords via the power supply unit. Insert the green DC
plug of the power supply unit into the green DC socket of the SKQ 40-/80-00. Then connect the SKQ
40-/80-00 with the output collection field using the DC patch cord SKZ 40-01. If multiple SKQ 40-/80-
00 are installed in the basic unit, the modules are interconnected with the supplied SKZ 40-00 DC
patch cords.
Notes
 Observe the operator's manual of the corresponding headend base unit!
 Before inserting or changing a module, pull the mains plug of the headend base unit from the socket! To
avoid dangerous overvoltages (danger: risk of fire/death), the base plate must be grounded according to
EN 50083-1, EN 60728-11:2010.
2015-06-07 | © AXING AG Switzerland | We assume no liability for design changes, type changes, errors and misprints
7

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

8pskSkq 80-008qpskQam

Inhaltsverzeichnis