6 Assembly
EN
The following equipment is necessary or recommended for installation:
4 x
1. Remove all parts from the packaging and check for completeness.
2. Make sure that any cables do not contain any voltage and switch off the
fuses.
Safety goggles
Stepladder
At least two people
Manual
Ceiling Screws
(Not included in delivery)
42