Commissioning

- Once you have waited 48 hours, connect your cabinet to the mains,
having checked that there is power to the socket (check fuses and their amperage,
the state of the trip, and if necessary try out another electrical appliance to
verify the supply).
- Once connected to the mains, make sure that the Off/On switch, on the right
of your cabinet's control panel, is set at "On" (I).
- As soon as your wine cabinet is plugged in, as long as the switch is set at
"On" (see diagram above), and the ambient temperature is higher than the
temperature you require, the green operating indicator for the cold circuit
comes on (unless this is a 1 temperature model, and is placed in an area that
has a temperature close to 12°C). The thermometer starts up and shows the
temperature.
In the event of malfunction, turn to page 17 & 18
Hygrometry for 1 temperature cabinets
(References MA1XP, MA1XP, ER1XG for Asia and Australia only)
Installing the cartridge of clay pellets:
- Remove the small rack from the bottom of the cabinet
- Open the 4 bubble wrap packets and remove the bricks
- Lock them together using the dowels to make 1 large rectangle and place this
directly on the floor of the unit
- Dampen the 4 cartridges with 2 or 3 glasses of water.
- Replace the small rack which will now sit on top of the groove.
.