17
Technical Information
General
General
Inspect the controller for any shipping damage. Before installing the
controller you must prepare some interconnection cables, i.e. the
power interconnections, the logic interconnections and the pump
connection. In the following paragraph are detailed the above
mentioned connections.
The PCB installed into the customer system must be positioned so that cold air
NOTE
(forced or natural convection) can flow through the PCB components.
Power Interconnections
Controller to Power Connection
The power supply from the external transformer must be connected
to J10 and J8 connectors.
See the following figure for interconnections detail.
Figure 7
242/280
J10 and J8 Connectors Interconnection
Turbo-V 70 PCB Controller User Manual / 87-900-871-01 (E)