EN
Electrical connection – Commissioning with factory settings
2
– Connect the BPS 3xxi via MS 3xx, MK 3xx, ME 3xx or KB 30x connection
hoods.
Information on which connection hoods are available for the respective BPS
can be found in the corresponding BPS operating instructions.
– Connect voltage supply and, if necessary, switching input, USB service inter-
face and host/bus interface.
– Switch on operating voltage – PWR LED must illuminate green.
– Position the bar code tape in front of the BPS, at a distance of approx.
100 mm.
– After successful determination of the position, the PWR LED is permanently
lit green.
LED indicators
LED
Status
PWR
OFF
Green, flashing
Green, continuous
light
Red, flashing
Red, continuous
light
Orange, continu-
ous light
Orange, flashing
BUS
OFF
Green, flashing
Green, continuous
light
Red, flashing
Red, continuous
light
Orange, flashing
14
Description
Device switched off
Device initialized
Device ready
Warning
Device error
Service active
PROFINET wave function
No operating voltage
Bus/interface initialization
Bus operation ok
Communication error
Network error
PROFINET wave function