Herunterladen Inhalt Inhalt Diese Seite drucken

Install Optional Modules, If Any; Reinstall Cover - ABB ACQ580-01 Kurzanleitung Für Die Installation

Frames r0 to r5
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 107

Install optional modules, if any

See chapter Electrical installation in ACQ580-01 (0.75 to 250 kW) hardware manual
(3AXD50000035866 [English]).

Reinstall cover

See figure
H
on page 172.
1. IP21, Reinstall the box cover: Slide the cover upwards (1a) and tighten the
retaining screws (1b).
2. IP21, Reinstall the module cover: Put the tabs on the inside of the cover top in
their counterparts on the housing (2a), press the cover at the bottom (2b) and
tighten the retaining screws (2c).
3. IP55, Reinstall the front cover: Put the tabs on the inside of the cover top in their
counterparts on the housing (3a), press the cover at the bottom (3a) and tighten
the retaining screws (3b).
For start-up instructions, see chapter
EN – Quick start-up guide
105
on page 175.
R0-
R4
R5
R6-
R9
EN
DE
ES
FR
IT
RU
SV
ZH

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis