Herunterladen Inhalt Inhalt Diese Seite drucken

Emptying The Hydraulic Circuit; Machine Emptying Process: Machine Switched On And In Normal Operating Conditions; Machine Emptying Process: Machine Cold And Not Functioning - Faema Barcode New Touch Gebrauch Und Installation

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 137

EMPTYING THE HYDRAULIC CIRCUIT

When the machine is stored or during transportation from one location to another, the services boiler, coffee
boiler, and the tubes of the hydraulic circuit must be emptied.
For this procedure, open the rear panel to access the tubes. For more information, please consult the technical
manual.
MACHINE EMPTYING PROCESS: MACHINE SWITCHED ON AND IN NORMAL
OPERATING CONDITIONS
access to the TESTING menu;
set YES at the parameter "EMPTY BOILER";
access the manual controls and operate the "Esc" discharge solenoid valve until
the pressure on the display is 0.2 bar;
switch off the machine;
open the rear panel;
manually empty the coffee boiler:
Unscrew the cap (A
(A
B).
remove the water feed tube;
message to appear";
after the error message appears, zero the error log, switch off the
machine, and close the rear panel;
now the machine can be packed and transported.

MACHINE EMPTYING PROCESS: MACHINE COLD AND NOT FUNCTIONING

open the rear panel;
Manually empty the coffee boiler and services boiler:
BOILER: Unscrew the cap (A
B).
(A
D
D).
the tubes (C
remove the water feed tube;
message to appear";
after the error message appears, zero the error log, switch off the
machine, and close the rear panel;
now the machine can be packed and transported.
B);
B);
C
6 EN
A
D
A
C
B
B

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis