Herunterladen Inhalt Inhalt Diese Seite drucken

Deleting Switching Points - Honeywell HR 40 Montage- Und Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
Operating example
In the following example, the start of the heating period for Wednesday is set
to 7.30 a.m. and the end to 10.30 p.m (22:30).
1. Press the
PROG
2. Turn the adjustment dial until
Wednesday is now selected.
3. Confirm the selection with the
4. Set
using the adjustment dial.
5. Confirm with the
6. Set
using the adjustment dial.
7. Confirm with the
8. End the procedure with the

Deleting switching points

Note: Please note that two switching points each determine a heating period.
1. Press the
PROG
2. Select all the weekdays: Set
– or –
Select an individual day:
select the desired weekday with the adjustment dial.
3. Confirm the selection with the
4. Keep pressing the
5. Turn the adjustment dial until
38
button.
PROG
button.
PROG
button.
PROG
AUTO
MANU
button.
PROG
button until the required switching time appears.
PROG
appears in the display.
button.
button.
using the adjustment dial.
button.
appears in the display.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis