Safety Notes
Gloves should be worn during installation to prevent crushing and cutting
injuries.
The hot and cold supplies must be of equal pressures.
Installation Instructions
• Prior to installation, inspect the product for transport damages. After it has been
installed, no transport or surface damage will be honoured.
• The pipes and the fixture must be installed, flushed and tested as per the applica-
ble standards.
• The plumbing codes applicable in the respective countries must be observed.
Assembly
Install body with G 3/4 outlet pointing downwards. (see page 34)
Important! The gasket is not suitable for hot glue.
The iBox can depending on the building application be mounted in different ways,
Installation examples please see page 35.
1. Fig. 3a / 3A
Direct wall installation.
2. Fig. 3b / 3B
Direct wall installation with 10 mm adjustable mounting studs.
3. Fig. 3c / 3C
Installation on carrier system.
Bath tub / Exafill (see page 42)
Tub outlet: Screw in the plug (Fig. 1 - 3)
Special information for UK
If installing this product with a pump, please be aware that it has to have negative
head switching. This product will not function with a positive head pump.
Technical Data
Operating pressure:
Recommended operating pressure:
Test pressure:
(1 MPa = 10 bar = 147 PSI)
Hot water temperature:
Recommended hot water temp.:
Rate of flow by 0,3 MPa:
Outlet 1 - 4:
Outlet Hand shower:
max. Rate of flow:
Connections G 3/4:
Connections overhead shower G 1/2
Thermal disinfection:
The product is exclusively designed for drinking water!
4
English
max. 1 MPa
0,1 - 0,5 MPa
1,6 MPa
max. 70°C
65°C
26 l/min
15 l/min
38 l/min
cold right - hot left
max. 70°C / 4 min
Assembly see page 34
Symbol description
Do not use silicone containing acetic acid!
Dimensions (see page 31)
Flow diagram (see page 38)
Center shower tub (see page 38)
X
The wall must be reinforced in this area.
i
Installation example (see page 38)
Warm water
Cold water
Spare parts (see page 44)
Test certificate (see page 33)