Packing and unpacking
The machine will come packaged in a carton with foamed
polyester inserts to guarantee perfect safety during transport.
•
Handle the carton in compliance with the instructions.
•
Open the carton and make sure that all components are
intact. Keep the carton for any future machine removal.
•
Remove screws A and lift machine from pallet.
•
Remove bars B.
•
Lift the machine according to the instructions and place it
in its selected setting for installation.
Installation area
The selected machine work setting must be sufficiently lit and have an electric power outlet. The worktop must be
sufficiently large, perfectly level and dry. The machine should be installed in non-explosive environments. In any
case, installation should be carried out by taking into account any applicable industrial safety regulations in force.
Environmental Condition Table
Descriptions
Working temperature
Storage temperature
Relative humidity
Ambient dust
Electric connection
DANGER – CAUTION: Electric connection to the power
mains should be executed by skilled engineers.
Check for the perfect effeciency of the plant grounding system. Make sure
that the line voltage (V) and frequency (Hz) correspond to the machine
ratings (refer to the machine identification plate and wiring diagram). The
machine comes equipped with an electric cable to which a multipolar plug
should be connected. Plug the machine into a main wall switch with
differential.
Three-phase connection
Start the machine for just a few seconds and check that the beater turns in
the right direction. If this is not the case, disconnect power and exchange
two of the three phase wires in the plug.
0÷35 °C (32÷95 °F)
-15 to +65 °C (from –6.8 to +149 °F)
Maximum 80% at an ambient temperature of 20 °C
Maximum 50% at an ambient temperature of 20÷60 °C
Lower than 0.03 g/m³
7
INSTALLATION
Values
Single-phase
connection
230V – 1Ph
2
Three-phase
connection
230/400V – 3Ph