Herunterladen Inhalt Inhalt Diese Seite drucken

Daily Maintenance; Weekly Maintenance - EdilKamin IDROPELLBOX Installations-, Betriebs- Und Wartungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 82
Before performing any maintenance, disconnect the appliance from the mains.
Remember to vacuum the combustion chamber before each ignition
Should ignition fail, do not re-ignite until you have emptied the combustion chamber
Attention: the pellet emptied from the combustion chamber mustnotbe deposited inside the hopper.
Failure to perform regular maintenance, at least on a seasonal basis, could lead to poor functionality.
Any problems resulting from lack of maintenance will immediately void the warranty.
NOTE: The DEALER, upon commissioning, sets the kg value of consumed pellets; after which, the message "SERVICE
maintenance, described above and explained by the DEALER during commissioning, to the extent of his abilities. To elimi-
nate the message from the display, press the boiler button for at least 5 seconds after having completed maintenance.

DAILY MAINTENANCE

ust e per ormed using a vacuum cleaner see optional e tras page 41 , the hole procedure ta es up a e minutes ever da .
pen the door, remove the com ustion cham er 1 - g. A and empt the residue out into the ash pan.
crap the com ustion cham er ith the spatula provided, removing an o structions in the openings.
Ta e out and empt the ash 2 - g
emove the com ustion cham er or use the spatula to scrape it and clean out an
acuum the com ustion cham er holder, clean the edges here the com ustion cham er is lodged into its seat.
Clean the glass, i necessar
NEVER SUCTION HOT ASH
g. A

WEEKLY MAINTENANCE

Clean the hearth a ter having removed the ash pan 2 - g. C and the smo e o plate 3 - g. C .
uction clean the smo e o compartment 4 - g. C
Clean the chimne
ue using the s a s moving the relative metal levers up and do n 6 - g. D .
Clean the com ustion cham er and the smo e e tractor, pa ing care ul attention 5 - g. C .
pen the e ternal door and the lo er panel remove the 3 scre s to open the chimne
suction the residue. The quantit o residue that orms depends on the t pe o uel used and the t pe o s stem.
Note:
1) Be sure to close the inspection hole once this operation is complete.
MAINTENANCE
pan into a reproo container the ash ma still contain hot parts and/or em ers .
hen cold .
1
picture on ollo ing page
loc ed holes on all sides
2
g.
ue's inspection hole and 7- g. E and
- 37
-

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis