Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning/Filling With Oil - Honeywell SM-RI-X Q75 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 39

3.7 Commissioning/Filling with oil

CAUTION!
Before commissioning, meters with an oil pump must undergo
initial lubrication (> see "To insert oil").
CAUTION!
Always keep the supply tank topped up with oil to prevent air
entering the pipe system. Use only fresh, clean oil. The supply tank
must be sealed tightly immediately after filling so that no dirt or
water can get into it.
CAUTION!
Use only the specified oil supplied. The oil can be ordered from
Honeywell. If a different oil is used, the warranty will be void.
On gas meters without an oil pump, the section
entitled "To insert oil" can be omitted (continue
with "Commissioning").
To insert oil:
 Open the cover of the oil supply tank (see
Fig. 6).
 Fill the oil supply tank with the supplied oil.
 The oil quantity is sufficient when the oil level is
visible in the strainer.
 The oil pump must be actuated as indicated in
Table 5 | Maintenance instructions.
73024521a
© Elster GmbH | All rights reserved. Subject to modification
Honeywell
Fig. 6 | Oil supply tank
Fig. 7 | Oil pump with lever
23

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis