Herunterladen Diese Seite drucken

Electrode-Deflector Positioning; Operation Cycle - Lamborghini Caloreclima ECO 50/2 Installationsund Wartungsanleitung

Zweiflammige gasbrenner
Vorschau ausblenden Andere Handbücher für ECO 50/2:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 57

ELECTRODE-DEFLECTOR POSITIONING

After mounting the choke (or chokes), check the correct position of the electrodes and deflector, following the
listed specifications (mm). It is advisable to check the specifications after each intervention on the combustion
head.

OPERATION CYCLE

Thermostat room temperature - furnace
Motor
Transformer
Electromagnetic valve 1° flame
Thermostat modulation
Air flow control
Electromagnetic valve 2° flame
Photo resistance
- starting the furnace
A
B
- presence of flame
- end of starting procedure
C
C-D - normal operation
D
- thermostat shut-down (TA-TC)
- 0
4
+1
T1
T2
T3
T3n post-ignition time
5
pre-ventilation time
safety cut-off time
pre-ignition time
6
+0
65
+0,5
LOA 44
25 sec.
5 sec.
25 sec.
2 sec.
31
LMO 44
26 sec.
5 sec.
25 sec.
5 sec.

Werbung

loading

Diese Anleitung auch für:

Eco 70/2