fr et GB de fagor induction I2.qxp
1 1 / INSTALLING YOUR APPLIANCE
•
HOOK-UP
• 220-240 V monophase hook-up
32- amp fuse.
Black or grey
Blue
Brown
L
N
• 400 V 2N triphase hook-up
16-amp fuse.
Separate the two phase wires (L1 and L2)
before hooking up.
Black or grey
Brown
Blue
N L1
L2
For a 400 V 2N triphase hook-up, if your hob
malfunctions, check that the neutral conduc-
tor is properly connected.
28/02/2006
17:07
Page 63
All manuals and user guides at all-guides.com
These hobs must be connected to the power
grid via an electrical outlet that complies with
EIC publication 60083 or an all-pole cut-off
device that complies with installation regula-
tions in effect.
When power is first supplied to your hob, or
after an extended power outage, an indicator
light will appear on the control panel. It auto-
Green/yellow
matically disappears after approximately 30
seconds, or as soon as any touch control on
the control panel is pressed. This display is
normal and, if needed, serves as an indication
to the after-sales service staff. In all cases, the
user of the hob should disregard it.
Warning
If the power cable is damaged, it
should be replaced by the manufacturer, its
after-sales service department or by a per-
son with similar qualifications to avoid dan-
ger.
Green/yellow
IT IS IMPERATIVE that you mount the protec-
tive flue with a cable clip.
63
EN