Install the lighting chain at the desired installation-spot.
Always install the device via all fixation holes. Do only use appropriate screws and make sure that the
screws are properly connected with the ground.
Connect the connection cable plug of the last LED module in the chain with the controller.
Connect the connection cable of the controller with the transformer. Plug the transformer into your outlet.
Make sure that the outlet is in a dry area.
OPERATION
After you connected the lighting chain to the mains, the modules start burning.
Controller Functions
N, X, Y, Z correspond to the four numbers on the display with „channels" from 0-9.
Y, Z are used exclusively to control speed, the exception being „channel" N - 0.
The button „*" is the input button. Please press the * button before entering the desired function.
The button „#" is the confirming button. After choosing the desired function, please press the # button to
confirm.
Please see the following table for the various channels and functions.
11/23
51929330_V_1_1.DOC