Herunterladen Inhalt Inhalt Diese Seite drucken

Device Description / Detailed Drawing; Configuration / Initial Operation - Storch ProCut multi Bedienungsanleitung

Dämmplatten-schneidegerät
Vorschau ausblenden Andere Handbücher für ProCut multi:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Device description / initial operation of the ProCut multi cutter
Fig. 1: Front view, transport and storage position
(cutting bow and bearing rail retracted)
1 = Cutting bow
5 = Upper set screw for cutting bow
6 = Lower set screw for cutting bow
7 = Set screw for bearing rail
8 = Bearing rail for foam board

Configuration / initial operation

The device is delivered in a transport and storage case:
Open the case and remove the device by lifting it by the base plate (no. 10, fig. 1).
Transfer the device to where it is going to be used on the scaffolding and suspend it using the rear scaffold mount (no.
2, fig.2). The transformer cover (no. 3, fig. 2) now butts against the lower scaffold section of the backrest. Prevent the
device from falling by securing the supplied tension strap (no. 4, fig. 2) to the lower section of the backrest: Feed the
tension strap through the gap between the transformer and transformer cover (on the rear side of the device), then feed
it behind the scaffolding pole and back into the strap fastener and pull the strap tight.
If the device is to be mounted on the freestanding support (art. no. 57 00 50, fig. 4), suspend the device via the upper
cross-member of the support and secure it to the lower cross-member as described above. To ensure the foam board is
held securely unfold the board supports (no. 11b, fig. 3) as well. Make sure the device is mounted securely and at the
correct position.
5
10
7
6
45
8
1

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis