Herunterladen Inhalt Inhalt Diese Seite drucken

Battery Operation With Optional Battery Power Pack - KERN MTA 400K-1NM Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für MTA 400K-1NM:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

9.6 Battery operation with optional battery power pack

1
Open the battery compartment cover (1) at the base of the display unit and insert the
rechargeable battery. Charge the battery for at least 12 hours before initial use.
The appearance of the symbol
is almost exhausted. The weighing scale will remain ready for operation for a few
more minutes before switching off in order to save battery. Load rechargeable
battery.
Voltage has dropped below prescribed minimum.
Rechargeable battery very low.
Rechargeable battery completely reloaded
Prior to starting-up the balance, load the rechargeable battery completely.
Right underneath the display there is a LED with the symbol
If the LED lights green, the rechargeable battery is fully charged. If it is lighting blue,
it will be loaded.
If the balance is not used for a longer time, take out the rechargeable battery and
store it separately. Leaking liquid could damage the balance.
MTA-BAPS-e-1711
in the weight display indicates that the battery
.
17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis