Herunterladen Inhalt Inhalt Diese Seite drucken

Electrostatically Pre-Charged Air Filter • Coil Rotation - AERMEC Omnia UL 10 P Bedienungs- Und Installationsanleitung

Vorschau ausblenden Andere Handbücher für Omnia UL 10 P:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 28
Follow the wiring diagram with the equipment and shown
in this document when making the connections.
To protect the unit against short circuits, fit an omnipolar
thermal-magnetic trip 2A 250V (IG) to the power line with
a minimum contact opening distance of 3 mm.
Each control panel can control a single fan coil.
ELECTROSTATICALLY PRE-CHARGED AIR FILTER
Fire Resistance Class 2 (UL 900).
Easy to remove, it is supplied in a sealed box only to be
opened when it is to be used.
The electrostatically precharged filter is combined to the
normal mechanical filtration of the air that passes through
the filter, also electrostatic attraction of the dust will noti-
ceably increase its filtration.
The electrostatic precharge of the filter is spent after two
years of the box being opened, after this period it behaves
like a normal filter.
For this reason replacement over two years with a new one
is recommended (available as a spare part from Aermec
after-sales centres).
Cleaning frequently, removing the dust that has built up
using a vacuum, the use of water and cleaning substances
considerably speeds up the electrostatic precharge deterio-
ration.
COIL ROTATION
If for plumbing reasons it is necessary to rotate the coils,
after removing the mobile section, proceeds as follows:
– remove the electrical connections from the terminal strip;
– remove the screws fixing the basin and remove it;
– remove the screws fixing the coil and remove it;
– remove the partially cut parts from the right-hand side;
– rotate the coil and fix it with the previously removed
screws;
– refit the basin fixing it in position with the screws, insert
the plastic caps supplied, in the holes left free by the
plumbing connections;
all the basins can be used for drainage on both sides.
N.B.: Before connecting the condensate drainage pipe,
push in the diaphragm off the basin (if present) on the
plumbing attachment side, seal the drainage not used
with the cap provided.
– slide out the electrical connection from the right-hand
sided, remove the partially cut section and move the
cable fairlead from the right-hand side to the left;
– move the motor cable on the left hand side and pass it
through the cable fairlead ;
– move the terminal block and the U-bolt of the ground on
the left-hand side;
– restore the motor wire electrical connections;
GB
N
L
13

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Omnia ul 15 pOmnia ul 25 pOmnia ul 35 p

Inhaltsverzeichnis