Herunterladen Inhalt Inhalt Diese Seite drucken

JBL ProFlora u401 Bedienungsanleitung Seite 21

Vorschau ausblenden Andere Handbücher für ProFlora u401:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
GB
For units u403, m603, m1003:
Select a suitable place to position the pH computer (7) where it can be easily observed.
Install the CO
computer. More details are to be found on the instructions for use enclosed separately.
5.
For the CO
storage cylinder select place with a stable base and out of the reach of
2
children (e.g. bottom cupboard of aquarium). Place the m500 (1) refillable storage cylinder
onto the stand. The m2000 (2) refillable storage cylinder and the disposable u500 (3)
storage cylinder are free-standing. Place the cylinder in the position selected.
6.
Attach the pressure regulator fitting (for u402 and m602 with fitted solenoid valve) to the
storage cylinder:
Sets u401, u402, u403:
Screw the pressure regulator fitting (5,6) with the reverse internal thread briskly onto the
external thread of the disposable storage cylinder (3). After a few turns a brief hissing
noise will be heard. Continue to turn briskly until resistance is felt. Then turn about half
a turn more until the fitting is hand-tight. The left-hand gauge now shows the cylinder
pressure of about 60 bar and the right-hand gauge shows the operating pressure of about
1.5 bar. Close the adjusting screw clockwise if it is not already closed.
Sets m601, m602, m603, m1003:
screw the connecting nut on the bottom of the pressure regulator (4, 6) to the external
thread of the cylinder valve on the m500 (1) and m2000 (2) disposable cylinders. Firmly
tighten the connecting nut with the enclosed spanner. Close the adjusting screw clockwise
if it is not already closed.
Storage cylinders should lie flat or upside-down when in use!! This may damage
the pressure regulator!!
7.
Attach the CO
valve (6).
8.
Set u401:
Slowly open the adjusting screw on the pressure regulator and set a bubble rate of 10 – 15
bubbles in the bubble counter (approx. 15 – 20 bubbles in the reactor). At first the bubbles
will flow intermittently through the reactor, collecting at times into large bubbles. The
device needs approx. 48 hours to run in! After this time a bio-film will have formed on
the surface of the device, allowing the bubbles to rise freely upwards. After the necessary
running in time, set the bubble count for your aquarium, as described in Chapter 13.
Set m601:
Open the cylinder valve of the refillable cylinder fully. The left-hand gauge now shows the
cylinder pressure of about 60 bar and the right-hand gauge shows the operating pressure
of about 1.5 bar. Continue as described for set u401.
Sets u402 and m602:
First connect the power supply unit of the solenoid valve to a mains socket and connect the
12 V cable of the power supply unit with the cable of the solenoid valve. For u402 continue
as for u401 and for m602, as for m601. After the required number of bubbles have been
set for your aquarium (Chapter 13), connect the solenoid valve to the power supply which
is controlled by the time switch for the aquarium lighting. In this way the CO
interrupted at night when the plants do not require CO
Sets u403, m603 and m1003:
Set up the pH computer, carrying out the calibrations required for initial start-up in
accordance with the instructions for use enclosed separately. Set the integral solenoid
18
hose according to the illustration on the hose connection of the pH
2
hose to the hose connections of the pressure regulator (4, 5) or solenoid
2
.
2
supply is
2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis