Herunterladen Inhalt Inhalt Diese Seite drucken

Important Notes On Installation And Commissioning - RK Powerlift Memory Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

7.3 Important notes on installation and commissioning

It is essential that you note and obey the following instructions. Otherwise, people
may be injured or the lifting column or other components may be damaged.
This lifting column must not have additional borings.
This lifting column must not be used for outside operation.
The lifting column must be protected against moisture penetration.
Before the lifting column is started, you must always protect the top and bottom against
entry.
When fastening bear in mind that the stand surfaces and contact surfaces must completely
rest on a metal surface that is at least 5 mm thick.
After setting up and commissioning, it is essential that the mains plug is freely accessible.
You must not open the lifting column. Obey the safety information attached to the lifting co-
lumn.
The user must ensure that there is no danger when the mains plug is in position.
It must not be possible for the lifting column to fall over in use due to lateral forces.
When designing tables, take care to avoid crushing and shear points. These are to be pro-
tected appropriately.
Possible stop switches failures must be taken into practical consideration. The relevant stop
positions must be set up as required. Particularly in the case of overhead mounting or if there
is tensile load an external extension safeguard must be provided.
Automatic driving up of the column due to a fault is to be stopped immediately by pulling out
the mains plug.
If a mains lead and/or feed line is damaged, the lifting column is to be taken out of service
immediately.
7. Working life
53

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Powerlift memory synchro

Inhaltsverzeichnis