INSTALLATION
12. Slide the UPS rear hold-down bracket into the slot on the UPS rear
10
EATON Powerware
panel.
Be sure the rear hold-down bracket is fully seated and then tighten
the wing nuts. The UPS is now secured in the rack.
Figure 8. Securing the Back of the UPS
®
5125 (9910-P65) UPS Installation Guide for IBM
UPS Rear
Hold-Down
Bracket
®
S
Applications
164201638 Rev A