Herunterladen Inhalt Inhalt Diese Seite drucken

Lister GEOSTAR G5 Bedienungsanleitung Seite 65

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Welding wedge replacement
It must be ensured before dismantling that the device is switched off with the main switch (2) and
the power cord is disconnected from the mains.
A. Rotate the ring on the welding wedge plug (13) counterclockwise until it hits the stop.
Pull off the welding wedge plug (13) from the device.
B. Loosen the welding wedge locking screw (24) with the socket wrench (wrench size 5 mm).
C. Loosen the cylinder screws (50) with the socket wrench (wrench size 5 mm).
Pull off the welding wedge unit towards the rear.
D. Move the new welding wedge (5) inward into the guide (51).
E. Tighten the welding wedge locking screw (24).
F. Tighten the cylinder screws (50) with 8.8 Nm.
G. Insert the welding wedge plug (13) back into the socket (54) and tighten the ring on the welding wedge
plug (13) clockwise until it engages.
A
13
D
51
G
13
54
B
E
5
24
CAUTION!
After the replacement of the welding wedge, it is mandatory
to have the factory setting (point A–D) applied (see chapter
welding wedge position factory setting).
C
24
50
F
50
65

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Geostar g7

Inhaltsverzeichnis