The extractor hood is designed to be
mounted on the wall.
During installation, optional accessories may
also require fitting.
Observe the minimum distance between
hob and extractor hood (see "Safety
instructions")!
Avoid damaging the sensitive surfaces!
Preparing the wall
The wall must be level and vertical.
The enclosed screws and wall plugs are
suitable for solid brickwork. Use the
appropriate fixing materials for other wall
structures (e.g. plaster board, porous concrete,
poroton bricks).
Ensure that the wall has adequate load
bearing capacity.
Ensure that the wall plugs are secure.
Max. weight in kg: 21
Design subject to modification in line with
technical development.
Installation preparations
1. Mark a centre line on the wall from the
ceiling to the lower edge of the extractor
hood.
2. Using the enclosed template, mark
positions for the screws and, to facilitate
attachment, the contour of the attachment
area.
The lower edge of the template
corresponds to the lower edge of the
extractor hood.
3. Drill 4x 8 mm holes for attachment of the
extractor hood and 2x 8 mm holes for the
fixing bracket for the flue duct and press in
wall plugs flush with the wall.
4. Screw on the fixing bracket for the flue
duct.
5. Screw in the 2 middle screws as an
installation aid, leaving them projecting by
approx. 5 mm.
Attachment
1. Remove the protective film from the
extractor hood. Attach the extractor hood,
align and screw tightly into place.
2. Connect the pipes (see "Connecting
pipes").
3. Connect to the power supply (see
"Electrical connection").
Installation
27