Herunterladen Inhalt Inhalt Diese Seite drucken

Yamaha TT-R125 Handbuch Seite 360

Vorschau ausblenden Andere Handbücher für TT-R125:
Inhaltsverzeichnis

Werbung

CLUTCH AND PRIMARY DRIVEN GEAR
9. Adjust:
Push lever position
G
Adjustment steps:
Loosen the locknut 1.
G
Turn the push rod 1 2 clockwise or coun-
G
terclockwise to match alignment marks.
Hold the push rod 1 to prevent it from
G
moving and tighten the locknut to specifi-
cation.
Tighten the locknut 1.
G
Locknut:
8 Nm (0.8 m • kg, 5.8 ft • lb)
10. Install:
Dowel pins
G
Gasket (right crankcase cover)
G
Right crankcase cover
G
Negative battery lead
G
(TT-R125E/TT-R125LWE) 1
Lead holder
G
(TT-R125E/TT-R125LWE) 2
Bolts (right crankcase cover)
G
NOTE:
Apply
Quick
G
No.1215) to end of the right crankcase cover
bolts, as shown.
Tighten the bolts in stages, using a criss-
G
cross pattern.
Quick gasket
ACC-QUICK-GS-KT
YAMAHA Bond No.1215:
90890-85505
11. Install:
Kickstarter crank 1
G
Nut (kickstarter crank) 2
G
NOTE:
Install the kickstarter crank so that there is 5 ~
10 mm (0.2 ~ 0.4 in) a between the kickstarter
crank and the right crankcase cover.
4 - 48
ENG
10 Nm (1.0 m · kg, 7.2 ft · lb)
®
gasket
(YAMAHA
®
:
50 Nm (5.0 m · kg, 36 ft · lb)
New
Bond

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis