Herunterladen Diese Seite drucken

Building In - Pelgrim GKB410 Anleitung

Vorschau ausblenden Andere Handbücher für GKB410:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

installation instructions
56

building in

1. Make the cut-out in the work surface. Ensure that there is sufficient space
allowed at the sides and at the back.
590
560
min. 50
600
GKB410/415/416/417
720
560
min. 50
600
GKB475/477/478
600
560
min. 50
GKB425/427/428
909
840
min. 50
600
GKB495/497
510
720
45
480
560
min. 50
600
GKB470W/472W
720
522
45
480
560
min. 50
600
GKB475W/477W/478W
720
522
45
560
480
min. 50
600
GKB463/465
522
50
480
57
522
45
480
522
45
480
522
45
480
Please note:
The distance between the hob and the rear wall must be at least 50 mm.
2. Make a hole in the side of the kitchen cabinet to enable the gas pipe to be
passed through.
3. Place the appliance in the cut-out.
4. Secure the appliance in position.
5. Make the gas connection. Check the gas connections with a soap/water
mixture (see "Gas Connection").
6. Put the plug in the socket (see "Electrical Connection").
7. Test to check the appliance is operational.
The building in of the hob in combination with a built-in oven is described in
the installation guide for the oven.
Attention:
The underside of this built-in hob becomes hot. Take care that you do not
place any flammable or plastic objects in any drawer under the appliance.

Werbung

loading