Herunterladen Inhalt Inhalt Diese Seite drucken

Speck-Pumpen Badu Tec Betriebsanleitung Seite 23

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

a) Special spring-loaded non-return valve by Speck
Order no. 240.9102.063
b) Sewer pipe
9.
Note
An additional "backwash" cycle can be started within the seven days by means
of a pressure sensor. Please get in contact with us for further information (ex-
tended BADU Easytronic and pressure sensor for BADU Easytronic).
10. Declaration of conformity
We, Speck Pumpen Verkaufsgesellschaft GmbH, Neunkirchen am Sand, Ger-
many, herewith declare that the device/s (machine/s) specified in the Operating
Manual complies/comply with the latest EC directives.
The corresponding declaration of conformity can be downloaded from our web-
site: www.speck-pumps.com
Subject to technical modifications!
23

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Badu easytronic

Inhaltsverzeichnis