a During Assembly
Carry out the assembly steps in the order set out in the instructions.
Step 1: Assembly of base profiles:
Be sure to bend the profiles into 90° , and to tighten firmly with screws 447.
Step 2: Assembly of the corners profiles A711 & A712:
Pay attention to set the profiles according to the illustration detraction shown on the
profiles A711 during the assembly of profile A761.
Note: All nuts 412 should be on the inside of the stretcher,insert the screws 411 from
the outside inwards.
Do not fasten the screws and nuts until you complete your greenhouse assembly.
Step 3: Connect profiles A721,A722 to the base.
Step 4: Assembly of profile A754:
Be sure to use the lower hole of existing two.
Step 5: Assembly of the gutter A731 (The profile also includes the door track):
Be sure to locate the gutter as shown in the illustration.
Step 6: Assembly of profile A715 and A716:
Connect the profiles as shown in the illustration.
Step 7: Assembly of the A741 profiles:
Connect the profile A741 on both ends to profiles: A715 and A716, and mark the
connecting points (to the wall), using the pre-drilled holes in the profile.
Step 8: Assembly of profile A702 on the roof:
Connect the profile A702 to profile A741 on one side , and A731 on the second side.
Step 9: Assembly of profile A701 on the front wall:
Connect the profile to the profile A731 on one side and to profile A761 on the second side.
Step 10: Door sub-assembly:
Insert rubber seal R303 into profiles A771. It is advisable to use small amount of tender
appropriate lubrication material. Connect profiles A771 with profiles A182 using screws 4008.
Step 11: Door sub- assembly (continued):
Lay panel P502. Be sure to insert both ends into the channel in profiles A182.
Step 12: Connect plastic strips P332 on both sides of panel P502.
Note: It is imperative to thread in the plastic strips onto the aluminum profiles in assigned
position. See illustrations A to D.
Step 13: Door sub-assembly (Continued):
Connect all four plastic rollers P304 using screws 421 and nuts 423.
Step 14: Assembly of the door to wall panels:
Slide the door onto the track on profile A731 (gutter), at the same time on profile A761.
Insert two screws, 411& nuts 412 on both ends of profile A731.
Step 15: Lay panel P501. Be sure to insert upper and into the channel in profile A731
and profiles A754.
Step 16: Connect plastic strips P331. See illustrations A to D.
Step 17: Apply panel P507.
Step 18: Connect plastic strips PR335 and P336.
Step 18: Connect plastic strips PR335 and P336.
Step 19: Apply roof panel P508 and triangle panels P510 and P511. Connect plastic strips P338.
Step 21: Vent sub-assembly:
Apply profiles A782, A151, A752 and vent panel P509. Slide panel P509 into the groove in profile
A151. Slide profiles A782 on each side of panel P509 until they fit the holes on profile A151 ends
and the two holes on the panel P509. Connect corners with screws 411 and nuts 412. Slide the
final profile A752 until it fits the holes on both profiles A782 and the two holes on the panel
P509. Connect corners with screws 411 and nuts 412. Tighten all screws.
Step 22: Assemble according to illustration below.
Step 23: Fasten all screws and nuts of your Lean-To greenhouse.
Step 25: Fasten all screws and nuts of your Lean-To greenhouse.
Screws 411 and nuts 412 are used thruoghout the assembly process.
Screws 411 are to be assembled from the outside and nuts 412 from the
l
inside of the greenhouse.
Do not fasten screws and nuts (411 & 412) more than 2-3 turns only.
l
Do not tighten them until completion of the panels' assembly, if not specified otherwise.