Checking Water Heating; Concluding Commissioning; Handing Over System To Operator; Operation - Sonnenkraft SLM120HE Handbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

9.6

checking water heating

D
Styring put into operation
Set primary pump to highest power level.
X
Check water heating by means of temperature display on the styring. Use external temperature
X
measurement equipment if necessary.
9.7

concluding commissioning

D
System and piping checked for leaks
D
Styring put into operation
D
Water heating checked
Put cover (optional) into place and screw on laterally.
X
9.8

Handing over system to operator

Instruct operator of system in operating the system (according to operating manual for styring).
X
Point out safety rules and maintenance intervals.
Note set parameters in logbook at the handover.
X
Hand over all manuals to operator:
X
Installation and operating manual
 
Operating manuals of the components (styring, etc....)
 
InFoRMAtIon
Operator:
Attach all manuals at the installation site of the stratified charging module or keep them in the
X
vicinity of the stratified charging manual.
10

operation

Observe third-party manual for the on-site installed thermal solar system.
X
Operate system in accordance with third-party manual for styring.
X
11

Error messages and malfunctions

Error messages appear in the styring display (see third-party manual).
In the event of error messages and malfunctions contact a specialist technician.
X
cAUtIon!
Risk of injury and property damage from leaks!
Have malfunctions resolved only by a specialist technician.
X
Installation & Operating Manual 12/2013