Herunterladen Inhalt Inhalt Diese Seite drucken

ZANKER DI7490-M Bedienungsanleitung Seite 23

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 27
INSTALLATION
23
FLUE ASSEMBLY - MOUNTING THE HOOD BODY
• Position the upper chimney section and fix the
upper part to the frame using the 2 screws 12c
(2,9 x 6,5) provided.
• Similarly, position the lower chimney section and
fix the lower part to the frame using the 2 screws
12c (2,9 x 6,5) provided.
Before fixing the hood body to the frame:
• Screw the 2 screws 12f half way into the holes
provided in the sides of the bottom of the frame.
• Remove the grease filters from the hood canopy.
• Remove any activated charcoal filters.
• Lift the hood canopy and engage the screws 12f
in the slots (A) as far as they will go.
• Working from below, fix the hood canopy to the
frame (B), using the 4 screws 12q and 4 washers
22 provided, then tighten all the screws securely.
ELECTRICAL CONNECTION
• Connect the hood to the mains through a two-
pole switch ha-ving a contact gap of at least 3
mm.
• Remove the grease filters (see paragraph Mainte-
nance) being sure that the connector of the feed-
ing cable is correctly inserted in the socket placed
on the side of the fan.
• Connect the control connector Cmd.
• Connect the lights connector Lux.
• Place the connectors in the junction box 24 and
close it using the 2 screws 12e (2,9 x 9,5) pro-
vided.
• Fix the junction box to the hood body using the 2
screws 12c (2,9 x 6,5) provided.
• For the recirculation version, fit the activated car-
bon odour fil-ter.
• Replace the grease filters.
���
���
���
���
��
���
���
��
���
���

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis