Herunterladen Inhalt Inhalt Diese Seite drucken

Before Installation; Installation Position; Preparatory Work - bürkert 2103 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für 2103:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Warning!
for control function i – danger if control pressure fails!
For control function I control and resetting occur pneumatically. If
the pressure fails, no defined position is reached.
To ensure a controlled restart, first pressurise the device with
control pressure, then switch on the medium.
8.2.
Before installation
Before connecting the valve, ensure the pipelines are flush.
The flow direction is optional.
8.2.1.
installation position
The piston-controlled diaphragm valve can be installed in any
installation position, preferably with the actuator face up.
installation for self-drainage of the housing
To ensure self-drainage:
Install housing inclined by an angle
Observe an inclination angle of 3° – 5° to the line axis.
Type 2103
Installation
α = 25° to the horizontal.
Fig. 18:
Installation position for self-drainage of the housing
8.2.2.
preparatory work
Clean pipelines (sealing material, swarf, etc.).
Support and align pipelines.
devices with Vg/Vs welded housing:
Before welding in the housing, remove the actuator.
english
α
Angle α: 25 °
Inclination to the line axis
3° – 5°
27

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis