Herunterladen Diese Seite drucken

Rehau MEPA Sanicontrol 925 Montageanleitung; Betriebsanleitung Seite 46

Teil 2

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Urinal automatic flushing system Sanicontrol 925 & MEPAorbit IR Prefabricated set part 2
Installation
(A) Loosen the screw connections on the inter-
mediate pipe and remove the intermediate pipe
and seals.
(B) Insert solenoid valve with new seals. Tighten
the screw connections.
Observe the direction of flow! The
solenoid valve has an arrow mark indi-
cating the direction of flow.
Make sure the screw connections are
tight! Only use new seals!
(C) Open the ball valve of the preliminary block-
age.
46
Align and install the mounting frame with the fas-
tening screws.
K819305/10.24(N)

Werbung

loading