Herunterladen Inhalt Inhalt Diese Seite drucken

Periodical Inspection; Test Operation - Panasonic U-16GE3E5 Bedienungsanleitung

Gas heat pump air conditioner
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 23

PERIODICAL INSPECTION

In order to have a comfortable operation of GHP for a long period, periodical inspections are necessary. When you
purchase your GHP, sign up for Panasonic's periodical inspections contract system.
When you sign up for a periodical inspection, specialist will call on you.
For more details about the inspection contract, ask your dealer or consult with one of our service centers.
 TEST OPERATION
Inspection items

(Test operation)

• Check the installation work
• Inspect the electricity wiring
• Inspect the equipment itself
• Check the engine system
• Check safety protection devices
• Operation data collection
• Gas leakage check
Contact your installer for repairs if something is found to be amiss during
the test operation.
EN - 3

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis