Commissioning
Only with 8060/1-2: Push the position switch until the stop.
Insert the contact (see sketch) so that the denture of the rod engages into the contact
groove.
Tighten the cable glands (tightening torque see "Technical Data").
Close cover.
10 Commissioning
Before commissioning the device, ensure that:
the device has been installed according to the directions
the device is not damaged
connections have been made correctly
all screws and nuts are fully tightened
the terminal compartment is clean
there are no foreign bodies inside the device
the cables and wires have been inserted correctly
the cable glands and stopping plugs are securely tightened
no part of the flameproof enclosure is damaged
14
Position Switch
8060/1
12060T00
114423E00
131382 / 8060603300
S-BA-8060/1-02-en-04/11/2008