Features
Powerful LED floods in a handy size
Operable in stand-alone mode or via DMX interface
•
DMX512 control possible via any commercial DMX controller (occupies 7 channels)
•
Sound-control via built-in microphone
•
Comfortable addressing and setting via control panel with LED display and four operating buttons
•
Functions: Color intensity, internal programs, auto mode, sound control, strobe, speed settings,
•
Master/Slave
Additional controlling possibility via the EUROLITE Remote Control CFL-9 / CFL-36, included in
•
delivery
Equipped with RGB COB LEDs
•
Easy installation
•
•
Locking possibility at the mounting bracket
IEC Power cord with safety-plug included in delivery
•
Switch-mode power supply for operation between 100 and 240 Volts
•
INSTALLATION
When installing the device, make sure there is no highly-inflammable
material (decoration articles, etc.) within a distance of min. 0.5 m.
Overhead rigging
Please consider the valid standards and national regulation during the installation!
The installation must only be carried out by an authorized dealer!
The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the device staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Procedure:
The device should be installed outside areas where persons may walk by or be seated.
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the device. If you lack these qualifications, do not attempt the installation yourself,
DANGER OF FIRE!
DANGER TO LIFE!
17/24
00092236, Version 1.0