4 With the unit in place, fix it with 4 screws through the fixing
holes.
In case of "saddle mounting" method
1 If not already done, position the unit on a lifting table and
secure it with straps, see "5.4.3 To prepare the unit" [ 4 11].
2 Position the unit (a) with the stays (c) right above the cold room
cutouts (b).
3 Lower the unit into the cutouts.
a
b
c
c
a
Unit
b
Cutout
c
Evaporator stay
4 With the unit in place, fix it with 2 screws through the bottom
fixing holes.
INFORMATION
It is easier to first seal the unit now before installing the
cold room roof.
The top screws will be installed after the unit is sealed and the roof is
installed. See "5.4.6 To seal the unit" [ 4 13].
LMSEY1A09/13 + LMSEY2A19/25
Daikin LMS
4P728170-1B – 2023.07
a
b
c
b
5.4.5
To reinstall the drain pan
1 Install the drain pan assembly (d):
▪ When "wall mounting" method was used, guide the drain
pan pipe (c) through the hole in the insulation pad (b). Then
further guide it into the unit through the hole in the back plate
(e).
▪ When "saddle mounting" method was used, guide the drain
pan pipe (c) through the hole in the cold room wall (a). Then
further guide it into the unit through the hole in the back plate
(e).
2 Instal the 7 screws (f) to fix the drainpan (d) to the evaporator.
Tighten the screws to a torque of 2.17 N•m.
NOTICE
When the drain pan is removed, the electric drain heater
must be slid out of the drain pan pipe. The electric drain
heater must be pushed back into the drain pan pipe when
the drain pan is reinstalled.
a
b
c
d
g
a
Cold room wall
b
Insulation pad assembly
c
Drain pan pipe
d
Drain pan
e
Back plate of the unit
f
Screw
g
Electric drain heater
5.4.6
To seal the unit
1 Seal the gaps between the unit and insulation pad and the cold
room wall with mastic.
If the saddle mounting method was applied:
2 Reinstall the cold room roof.
3 Complete fixing the unit further with 2 screws through the top
fixing holes.
5 Installation
e
c
f
f
f
f
f
Installation manual
13