24 | JUMBO TCS26 | First start up
4.

First start up

4.1

Unpacking

1. Remove the packaging paying attention to nails
detaching.
i
After unpacking check the integrity of JUMBO TCS26
and check that no components are visibly damaged.
In case of doubt do not proceed to start-up and con-
tact a qualified technician and/or your vendor.
2. Take out of the transport crate the standard accesso-
ries and the packaging materials.
i
Dispose correctly of packaging material, hand it over
to the designated collection points.
4.2

Installation

4.2.1

Machine positioning

1. Insert the appropriate lifting belts (length belt 1: 1.5
Mt, belt 2: 2 Mt), with sufficient capacity, as shown.
Warning - tilting danger!
The barycentre of the JUMBO TCS26 is not in
its centre.
It is necessary to lift the machine slowly.
|
1 695 400 376
2013-04-17
2. Lift the JUMBO TCS26 with a lift crane and install it
in the chosen area respecting the minimum distan-
ces shown in the picture.
i
For safe and ergonomic use of the JUMBO TCS26
it is recommended to leave a minimum of 750 mm
space from the nearest wall and of 900 mm from the
ceiling.
Warning - tilting danger!
During tire inflation considerable forces are
exerted.
The JUMBO TCS26 has to be fixed in at
least 3 points on the floor.