Commissioning
Check the device before commissioning!
Explosion protection is impaired!
• Observe the inspection requirements in the current national
• Check the device for proper installation and function before
Before commissioning, ensure the following:
• Check the mounting and installation.
• Inspect enclosure for damage.
• If necessary, remove foreign bodies.
• If necessary, clean the connection chamber.
• Check whether the cables have been inserted correctly.
• Check if all screws and nuts have been tightened firmly.
• Check whether all the cable entries and stopping plugs have been tightened firmly.
• Check whether all conductors have been clamped firmly.
• Check whether all covers and partitions for live parts have been installed and fastened.
• Seal the unused cable entries using plugs with a respective certification and unused
bores with stopping plugs certified for the respective type of protection.
• Check the tightening torques.
Also observe the further documentation such as the device list,
wiring diagram etc.
9
Operation
The control and distribution devices 8146/5 are installed in customer-specific
installations. The requirements during operation therefore depend to a large extent on the
operating conditions and the installation on site.
In order to ensure a correct operation, observe the documentation and the
instructions of the operating company!
137193 / 8146620300
2014-06-26·BA00·III·en·05
regulations before commissioning in order to maintain the
explosion protection.
commissioning.
WARNING
NOTE
Control and Distribution Systems
Series 8146/5
Commissioning
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
15