Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Commissioning - Bosch BEA 750 Originalbetriebsanleitung

Abgasmesssystem
Vorschau ausblenden Andere Handbücher für BEA 750:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
4.

Initial commissioning

4.1
Assembly BEA 065
1. Remove the packaging from all components sup-
plied.
i
Make use of the local return and collection systems for
disposal of packaging.
!
Proper disposal of the packaging material prevents
environmental pollution and possible health hazards.
1
5
4
9
459969-23_Ko
8
Fig. 1:
Installing the BEA 750
1 Mains socket BEA 065
2 BEA 065
3 Mounting hole
4 Storage tray BEA 065
5 Fastening screws
6 BEA 070
7 Parking brakes
8 Storage compartment for BEA 070
9 Power plug for BEA 065
2. Place the BEA 065 (fig. 1, item 2) on the storage tray
of the trolley (fig. 1, item 4).
3. Use the two fastening screws (fig. 1, item 5) inclu-
ded in the scope of delivery to fasten the BEA 065
(fig. 1, item 3) to the trolley.
!
The BEA 065 must always be secured to the trolley
by means of the fastening screws to prevent the
device from falling.
4. Insert the power plug (fig. 1, item 9) into the
BEA 065 (fig. 2, item 2).
i
The BEA 070 (fig. 1, item 6) can be kept in the sto-
rage compartment of the trolley (fig. 1, item 8).
Robert Bosch GmbH
2
3
5
6
7
Initial commissioning | BEA 750 | 15
11
10
9
2
459969-26_Ko
8
Fig. 2:
BEA 750 Connecting the cables and hoses
1 Connection cable B+/B–
2 Power supply cable
3 Hose (8 m) to exhaust gas sampling probe (gasoline)
4 PVC hose 1.4 m (2x)
5 Opening for cables and hoses (on back)
6 Cable tie for connection cables
7 Connection cable for cigarette lighter socket
8 Hose (30 cm)
9 PVC hose 1.4 m (2x) with cable ties
10 Coarse filter
11 Opening for PVC hoses
12 Exhaust gas sampling probe (gasoline)
13 Handles
14 Opening for cables and hoses (on side)
en
1
2
3
4
5
6
5
7
5
|
1 689 989 317
2016-12-14

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis